
The Southeast continues to remain blocked for 7 hours, after a landslide of soil and rocks on the Librazhd-Përrenjas axis, which blocked vehicle traffic in both lanes.
The situation has worsened even more after the company "ANK shpk", which was responsible for the construction of the road, activated excavators that continue to throw stones and rocks onto the road, during the collapse of the dangerous part of the mountain.
The police announced that in order to unblock the axis and enable the movement of vehicles, hundreds of which remained stranded on the road in the cold, vehicle traffic will be diverted to the Maliq-Lozhan-Moglicë-Gramsh-Elbasan axis.
Journalist Lorena Kodra reports that the old and new "Qukës-Qafë Plloçë" axes are not connected at the point where the collapse occurred, so traffic was diverted via Moglica.
However, since January 28, there have also been landslides on the Lozhan-Gramsh axis, in Moglica.
Lini një Përgjigje